How we work
How a delivery runs
The same procedure for any batch, from a single wagon of rebar to a plate line for structural steel. Every step is closed by a document, not a promise.
5
steps from specification to warehouse
2
control points · mill and warehouse
6
documents in the batch set
Порядок поставки
Five steps from specification to warehouse
One procedure for any batch, from a wagon of rebar to a plate line.
-
01
Specification
Grade, sizes, standard, tonnage. Tolerances and packing recorded the way the mill records them.
-
02
Producing mill
A mill that rolls this item itself. Price to your warehouse and terms fixed in the contract.
-
03
Mill inspection
Measurements, heat number checked against the certificate, marking, packing, weight. A photo-documented report for you.
-
04
Route of the batch
Wagon, container or road train. Paperwork by the bureau, the batch visible at every node.
-
05
Acceptance at the warehouse
Checked against the specification and weighed in your presence. The acceptance report closes the delivery.
You send
The bureau does
Document of the step
Контроль партии
Two control points
The batch is checked twice: at the mill before shipment and at your warehouse on unloading. Between the two points it travels with the documents both points check against.

Завод, КНР · before shipment
Mill inspection
Инспектор приезжает на завод до того, как пачки уйдут на погрузку. Что не сошлось на этом узле, дальше не едет.
- 01Plate thickness and pipe wall — with a micrometer, at several points of every bundle
- 02Rebar and bar diameter — with calipers, ovality within the standard tolerance
- 03Mill test certificate: the heat number on the tag matches the certificate
- 04Marking on the steel and tags: grade, standard, mill, heat number
- 05Packing: strapping, edge protection, bundles at the specified weight
- 06Batch weighed on the mill scales, every bundle photographed

Склад, Ташкент · on unloading
Warehouse acceptance
The bundle is lowered onto your site, weighing and checking happen in your presence, both sides sign the acceptance report. Defects confirmed by report are replaced: the producing mill supplies the replacement under its contract with the bureau.
- 01Bundle count and numbers against the packing list
- 02Batch weight on your scale or from the carrier’s documents
- 03Marking and tags against the mill certificate and the inspection report
- 04Condition of packing and edges after transit
- 05Acceptance report signed by both sides; discrepancies are recorded in it
Documents
What arrives with the batch
The package is assembled at the mill and in the bureau before shipment.
01
Mill test certificate (MTC)
Heat number, chemical composition, mechanical properties, standard. Checked against the bundle tag at inspection.
02
Inspection report with photos
Measurements, marking, packing, weight, bundle numbers. Drawn up at the mill before shipment.
03
Specification and packing list
Items, sizes, quantity and weight per bundle: what the warehouse acceptance is checked against.
04
Certificate of origin
Confirms the mill and country of manufacture for customs clearance.
05
Customs clearance
Declaration, HS codes and certification in Uzbekistan are handled by the bureau.
06
Acceptance report
Drawn up at your warehouse against the specification and scale weight. Closes the delivery.
Standards
GOST, GB, ASTM and EN side by side
Chinese mills roll to GB, Uzbek specifications are written in GOST. Grade correspondence is fixed in the contract.
| GOST | GB (China) | ASTM | EN | Used for |
|---|---|---|---|---|
| St3sp / St3ps | GB (China)Q235B | ASTMA36 | ENS235JR | Used forgeneral structural steel |
| 09G2S | GB (China)Q345B / Q355B | ASTMA572 Gr.50 | ENS355JR | Used forlow-alloy for loaded structures |
| A500C | GB (China)HRB500E | ASTMGrade 75 (520) | ENB500B | Used forribbed reinforcing bar |
| Steel 20 | GB (China)20# | ASTMA106 Gr.B | ENP235GH | Used forseamless pipe, boilers, machine parts |
| Steel 45 | GB (China)45# | ASTM1045 | ENC45 | Used forshafts, axles, fasteners |
| 08ps / 08kp | GB (China)SPCC / DC01 | ASTMA1008 CS | ENDC01 | Used forcold-rolled sheet |
| 08Kh18N10 | GB (China)06Cr19Ni10 | ASTM304 / 304L | EN1.4301 / 1.4307 | Used forgeneral-purpose stainless steel |
| 12Kh18N10T | GB (China)06Cr18Ni11Ti | ASTM321 | EN1.4541 | Used fortitanium-stabilised stainless steel |
| Ductile iron, GOST ISO 2531 | GB (China)GB/T 13295 | ASTMA536 | ENEN 545 / ISO 2531 | Used forductile iron water pipe |
Equivalents are the closest match, not identical: chemistry and tolerances differ between standards. The exact grade and standard are written into the contract.
Route of the batch
How we deliver
The route is chosen for the batch: tonnage, site and urgency. Paperwork and certification in Uzbekistan are handled by the bureau.
Ляньюньган → Достык → Ташкент
Rail
Gondola car or container via Kazakhstan. The main route for large batches: wagon lots, gauge change at the border, arrival at the terminal.
Wagon · container · Dostyk
Урумчи → Хоргос → Ташкент
Road train
Up to twenty tonnes per truck. For site batches, groupage and addresses a wagon cannot reach.
Up to 20 t · door to door
Гуанчжоу → Ташкент
Air freight
For urgent and light batches: the cargo lands in Tashkent and clears customs there. Costlier than the other routes, but the fastest.
Urgent · light batches
Price request
Send your specification and we will quote your batch
Price depends on grade, size, tonnage and delivery terms on the day of contract.
Request received